1.spraying project
energized projects;
professional protection to prevent pollution again;
professional construction team and tools;
construction capacity: 5 tons per day for substations; 20,000 pieces/day for transmission lines.
protection and cleaning |
coated insulators |
2.dip-coating projects
infrastructure and recontruction projects;
independent research and development of professional dip coating machine;
effectively solve the technical defects of manual spraying;
controllable quality, smooth and flat appearance, uniform thickness, strong adhesion, etc.;
professional packaging and transportation;
the workshop area is 3400m2, and the daily production capacity is 20,000 pieces/day.
3.mobile dip-coating projects
infrastructure, recontruction and insulator replacement overhaul projects;;
covering small area and strong flexibility;
effectively solve the technical defects of manual spraying;
controllable quality, smooth and flat appearance, uniform thickness, strong adhesion, etc.;
effectively reduce the cost of repeated packaging and round-trip transportation of insulators;
the daily production capacity is 2880 pieces.